Is Long-Duration Energy Storage Being Overlooked in Resource Planning?

By Anirudh Kshemendranath, Senior Technical Consultant, Dunsky Energy + Climate Advisors

Is Long-Duration Energy Storage Being Overlooked in Resource Planning?

How technology screening, resource assumptions, and modelling approaches may be limiting the role of LDES in future electricity systems

Electricity systems are changing, and so are the challenges of keeping them reliable and affordable. Growing electricity demand, increasing reliance on wind and solar, and more frequent extreme weather events are creating new challenges for resource planners. Ensuring reliability is no longer just about having enough capacity to meet peak demand. It also means having sufficient energy available when supply is constrained for extended periods.

Consider a system facing several consecutive days of high demand and low wind generation. A four-hour battery can help manage daily peaks, but its ability to contribute over successive days depends on opportunities to recharge. Technologies capable of storing and delivering energy over longer periods could play an important role in managing these conditions.

This is where long-duration energy storage (LDES) comes into the picture. Yet, despite its potential, LDES has had a limited presence in the preferred resource portfolios of Canadian utilities. Is this because these technologies are not yet well suited to the needs of electricity systems, or could the way we plan and evaluate resources be overlooking some of their value?

To explore this question, we examine three stages of resource planning that can influence whether LDES is considered and ultimately selected: how technologies are screened, how their costs and capabilities are represented, and how planning models capture their contribution to system reliability.

Figure 1: Provincial Plans Vary Widely in Their Treatment of LDES


Our review of Canadian resource planning practices identifies three methodological choices that can influence whether LDES is considered and ultimately selected:

·       Which technologies are included in the candidate resource portfolio.

·       How their technical and economic characteristics are represented.

·       Whether planning models adequately capture the operating conditions and reliability risks facing future electricity systems.

 First: Are Emerging Storage Technologies Being Screened Out Too Early?

Before evaluating potential investments, utilities must decide which technologies to include in their resource plans. This typically involves screening resources based on commercial readiness, cost, technical performance, and site feasibility.

These are important considerations, but the screening process can also determine which technologies never make it to a detailed economic evaluation. Our review of Canadian resource plans identifies three common factors that can limit LDES consideration (Figure 2).

1. Lack of distinct technology representation. Some plans consider storage as a broad resource category without distinguishing between individual technologies. Without technology-specific cost and performance assumptions, planners may overlook important differences in capabilities or exclude promising technologies from further evaluation.

2. Commercial readiness concerns. Limited operating experience and performance data can make utilities hesitant to include emerging technologies. However, LDES technologies are at different stages of maturity, and their commercial readiness may change considerably over a 15- to 20-year planning horizon.

3. Cost and site constraints. High capital costs, limited suitable sites, and development constraints can make certain technologies less attractive. While these are legitimate considerations, applying restrictive assumptions too early can eliminate potentially competitive options before their system value is fully assessed.

The challenge is finding the right balance between practical screening criteria and keeping promising options available for evaluation. Screening decisions should reflect the characteristics of individual technologies, their expected readiness when they would be needed, and how their costs and capabilities may evolve.

Figure 2: LDES Treatment in Canadian Resource Plans

 Second: Are We Accurately Representing What Different Storage Technologies Can Do?

 Getting a technology onto the candidate resource list is only the first step. How it is represented in planning models can be just as important.

Storage technologies differ in their costs, efficiency, operating flexibility, and ability to deliver energy over extended periods. Yet planning models sometimes rely on simplified assumptions that do not fully capture these differences.

Our review identifies three areas where resource characterization can influence how LDES competes with other resources (Figure 3).

 

1. Generic technology representation. Applying common cost and performance assumptions across storage technologies can obscure important differences in efficiency, asset life, operating constraints, and economics. Newfoundland and Labrador offers an example of a more differentiated approach, with distinct assumptions for lithium-ion, flow, and iron-air batteries. This allows planners to evaluate technologies based on their individual characteristics rather than treating storage as a single resource type.

2. Fixed duration assumptions. Many resource plans evaluate storage using predetermined discharge durations, such as four or eight hours. While this simplifies modelling, it can also limit the range of configurations the model can consider. Evaluating multiple durations allows planners to determine whether the additional value of storing more energy justifies the incremental cost.

3. Incomplete representation of grid services. Storage can provide several benefits, including capacity adequacy, energy shifting, and operating reserves. If a planning model recognizes only some of these services, it may not capture the full contribution of a storage resource. This is particularly relevant for LDES, where the ability to shift energy over extended periods may complement other system services.

The central issue is that not all storage technologies are interchangeable. Their value depends on what they can do, how much they cost, and what the electricity system needs. Representing these differences allows planning models to make more meaningful comparisons between storage technologies and other resource options.

Figure 3: Characterization Determines the Storage Options the Model Can Evaluate

  Third: Can Planning Models Capture the Value of Multi-Day Storage?


Even when LDES technologies are included and accurately characterized, there is another challenge: can planning models recognize the conditions under which they provide value?

This is particularly important for technologies designed to store energy over several days or longer. Their value may not be apparent when models focus primarily on daily peaks or typical operating conditions.

Two modelling choices are especially important.

1. Preserving chronology across multiple days. Capacity expansion models often use representative days or time slices to reduce computational complexity. While this makes modelling more manageable, it can also limit the ability to capture how storage operates across consecutive days or weeks.

Consider a period of low renewable generation lasting several days. A storage resource may need to conserve energy on the first day to meet demand later in the week. If each day is modelled independently, the model may not recognize this trade-off or the value of having additional stored energy available.

A 2026 modelling study illustrates this limitation. As the modelled periods increased from individual days to seven- and 14-day periods, longer-duration storage became more competitive. Full-year chronological modelling resulted in substantially greater deployment of 100-hour storage.

The implication is important: the way time is represented in a planning model can influence which storage technologies appear economically attractive. Using sufficiently long, linked representative periods that preserve storage state of charge can help capture these intertemporal trade-offs.

2. Representing prolonged and correlated system risks. Planning models must also reflect the conditions under which electricity systems experience sustained supply constraints. Extreme weather can create several challenges at once. A prolonged cold snap may increase electricity demand while reducing renewable generation. Drought conditions can limit hydroelectric output, while neighbouring systems experiencing similar weather may have less electricity available for imports. These risks matter because they can change both the amount of storage a system needs and the duration over which it must deliver energy.Research examining hydropower-dominant systems found that a 50% reduction in hydro availability increased the average selected storage duration from 6.3 to 23 hours. This illustrates how changing system conditions can influence the storage configurations that offer the greatest value.[1]

If planning models rely primarily on typical weather conditions or evaluate reliability risks independently, they may not fully capture these extended periods of system stress.

Ultimately, the value of LDES depends not just on how much energy it can store, but on when the system needs that energy and how long the need persists. Planning models must be able to represent these conditions to determine whether longer-duration technologies offer advantages over shorter-duration storage or other resources.

Takeaways: Planning to Identify Value, Not Predetermine Outcomes

LDES will not be the least-cost solution for every electricity system. Its competitiveness depends on technology costs, the existing resource mix, system flexibility, and the availability of alternatives. But determining whether it is competitive requires planning frameworks that can meaningfully evaluate its capabilities.

Our review highlights three opportunities to strengthen current practices: screen technologies based on their expected readiness when they would be deployed, represent their distinct costs and operating characteristics, and use modelling approaches that capture extended periods of system stress.

None of these improvements requires utilities to favour LDES. Rather, they help ensure that storage technologies are evaluated alongside other resources on a consistent basis, with their costs and potential benefits appropriately reflected.

As electricity systems evolve, these methodological choices will become increasingly important. Decisions about which resources to build have long-term implications for reliability and affordability. If planning models cannot recognize the value of certain technologies, utilities risk overlooking options that could help meet future system needs at a lower overall cost.

The goal is not to ensure that long-duration storage gets selected. It is to ensure that when it offers value to the electricity system, our planning frameworks can recognize it.

For further questions, you can always reach out to us at info@dunsky.com.

Staadecker, M., Szinai, J., Sánchez-Pérez, P. A., Kurtz, S., & Hidalgo-Gonzalez, P. (2024). “The value of long-duration energy storage under various grid conditions in a zero-emissions future.” Nature Communications, 15, 9501. DOI: 10.1038/s41467-024-53274-6

  • By Anirudh Kshemendranath
  • 2026-11-20